Bound to the success

Bound to the success

Brain Power

Brain Power

Brilliant future

Brilliant future

Green energy

Green energy

Internet of Thing (IoT)

Internet of Thing (IoT)

Value Creator

Value Creator

Innovative Technology

Innovative Technology

Green Technology

Green Technology

Life with Technology

Life with Technology

Hospital of the future

10:04:00 11/04/2016

On the  16/12/2014, T & D Engineering Ltd. signed a contrac for supplying the  Building management system equipment of Center Paediatrics Hospital Construction - Phase 2.

This is a key project of the Ministry of Health for the children – the future generation of the country. Therefore, the project was planned on large scale,  modern design to meet international standards. Technology systems, medical equipment are centralized managed to improve the efficiency of health care. Meanwhile, Building Management System will ensure the “Green” standards in the energy saving field, also in healthcare environments.

This is one of the most important criteria of all hospitals, to ensure “Clean” environmentally , prevent the spread of infection between functional areas. With the experience of Automated Logic Corporation in the field of medication, health-care, we have integrated ventilation air conditioning system with smart sensors to ensure the environmental indicators in the hospital. From now on, in addition to the temperature critetia, ventilation air conditioning system will operate according to all criterias of humidity, concentration of CO, CO2, differential pressure, air quality, .. in every functional areas such as the operating room, clinic, ...

On the other hand, with the action of simplifying the operations by follow automatic processes, the system will enable users flexibility  to make  adjustment  according to actual demand of medical care, reduce unintended errors and increase the life of the systems and equipment in the hospital.

Furthermore the use of the software with Vietnamese interface, will help Investor save operating costs as well as training time for technical team.

We hope that this model will be multiplied in the future so that every hospitals can achieve the “Green” standards for environmental and energy saving.

 

Processing...